Answers are grounded in this paper and cite their sources.
MYVAN/Mivan aluminium formwork is a repetitive construction technology used for high-rise and mass-housing projects where rapid floor cycles, dimensional consistency and a controlled concrete finish are important. The supplied project material describes a system based on lightweight, high-strength aluminium panels that can be assembled and reused for repeated floor construction. The technology supports monolithic casting of walls and slabs and is associated with smooth concrete surfaces that can reduce the need for extensive plastering. The present project review examines the technology, its objectives, scope, construction methodology, case-study observations, quality implications, cost and efficiency considerations, advantages and limitations, and future applicability. The supplied case study concerns a 23+ storey residential project using aluminium formwork for walls and slabs. A 6–8 day floor cycle is reported for the case study, while the project introduction gives a broader typical range of 7–10 days per floor. Panel reuse of up to 200–300 times is reported. These figures are retained as source-supported observations and are not treated as a controlled experimental comparison. The report expands the supplied project information into a structured engineering document with process diagrams, three-dimensional conceptual models, graphs, technical tables and illustrative calculations. Calculations that require unavailable project-specific inputs are explicitly identified as illustrative methods rather than measured results. The overall discussion shows how repetitive aluminium formwork can support faster construction, consistent finish, reduced finishing dependency and repeated use of formwork panels when the project has suitable repetition and adequate planning.
No takes yet. Share an insight, caveat, or question.
Malpuru et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: