Answers are grounded in this paper and cite their sources.
Tidal-flat islands often lack scheduled ferries because their landings dry out at low water. We propose a transferable, tide-constrained framework for planners and naval architects to assess the operability of an island ferry and specify its principal particulars, applied to Yubudo Island in Korea’s macrotidal Geum River estuary. A minimum tide-level model including the 350 cm drying height of the landing was coupled with 10 min tide predictions and an algorithm counting feasible 30 min legs within a 07:00–19:00 service window. For an 80 cm draft, the ferry could operate on 315 days in 2024, and each additional 10 cm of draft cost about 15 operable days and 76 round trips per year. Of the 51 non-operable days, 88% fell within three days of a quarter moon and 76% in July–December, when the higher high water occurred in the evening. Over a full nodal cycle, non-operable days averaged 38 per year, but bed accretion at the locally measured rate would outweigh sea-level rise. Fleet benchmarking and multicriteria decision analysis with stochastic multicriteria acceptability analysis supported an 18-gross-tonnage, 30-person, flat-bottomed fibre-reinforced plastic ferry with outboard propulsion and a draft of 0.8 m or less, based at the existing small-craft pier. Updating the tide, drying-height and allowance inputs transfers the framework to other drying landings; demand-responsive scheduling is a natural extension.
No takes yet. Share an insight, caveat, or question.
Yoo et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: