Answers are grounded in this paper and cite their sources.
Unused remote headroom may coexist with local overvoltage when transfer power or its timing prevents surplus energy from reaching the remote resource. This study derives a causal energy-transfer envelope retaining initial releasable energy, injection timing, and converter-mode limits. The envelope gives an exact feasibility condition for an ideal two-region system; its constant-capacity specialization separates resource insufficiency from fixed-controller violations, and a bandwidth penalty gives the lag and power-ramp capability a causal controller needs to realize the ideal transfer. A temporal network optimization retains a common storage history, minimizes persistent absorption additions, prices their location through its dual, and translates them into capacitance with coupled energy margins. In 2592 two-region cases, 670 of 2160 aggregate-capacity passes exhibit fixed-droop overvoltage, including 144 with a feasible ideal transfer, of which a causal controller with a 0.5 ms lag realizes 134. In 576 network cases, shared-equipment prefix bounds leave 59 infeasible cases unresolved. In a three-terminal resistance–inductance (R–L) circuit with finite converter–current response, a necessary voltage bound preserving the sign of the impulse response excludes 30 of 60 cases; validated ball arithmetic confirms every exclusion, the extension through the recovery interval changes none, and an available-power ceiling raises the count to 37. Cases that satisfy the bound remain unresolved until a controller is simulated. A switching-function modular multilevel converter model reproduces the averaged peaks within 0.8% at 30 kJ/MVA station energies and within 4.1% at the lower nominal energies, and 1200 randomly perturbed cases contain no exclusion that meets a safe trajectory.
No takes yet. Share an insight, caveat, or question.
Qin et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: