Answers are grounded in this paper and cite their sources.
The application of hydrogen fuel cell hybrid construction machinery is a critical solution for energy conservation and emission reduction in heavy earthmoving operations. It is difficult to achieve maximum energy efficiency in complex environments. Most conventional methods break down the problem by handling scheduling and power allocation separately, which struggle to account for real-time energy changes. While dynamic programming (DP) is capable of providing optimal solutions, it suffers from a rapid increase in computational burden for high precision and efficiency. This study develops a coordinated framework centered on an adaptive discrete precision improved multistage dynamic programming (IDP) in joint scheduling and energy management for hydrogen hybrid fleets. After the operational synchronization has been achieved, the required power is allocated between the dual energy sources to prevent severe load spikes. Through this coordinated strategy, the framework achieves high-precision power allocation during energy-intensive phases with a low computational burden. By applying the strategy to realistic earthwork scenarios, the IDP algorithm yields a 35.14% reduction in hydrogen consumption against the standard DP baseline. Simultaneously, it maintains a stable construction time of 1,759.1 s. In comparison with other meta-heuristic algorithms such as DP-FOX, severe fuel penalties are avoided by the proposed IDP, leading to optimal fuel economy and providing a practical computing pathway for sustainable fleet management.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: