Answers are grounded in this paper and cite their sources.
Microgrids are usually assessed with the grid connection taken as given, although its power limits import and export and its cost is paid before operation starts. Choosing this power is therefore a trade-off between the connection cost and the costs of imported energy, backup generation and unserved load, which the reviewed levelized-cost formulations do not capture. This paper presents a model for determining the optimal power of connection to the electric grid, which limits import and export, to minimise the levelized cost of the microgrid. Unlike the reviewed formulations, the connection power is a decision variable and its cost is part of the objective. The objective combines the costs of generation and battery storage, the import costs, export revenues and fuel costs, the penalties for lost load, and the daily cost of the connection. A cost-based source-selection strategy compares the day-ahead market price with the fuel cost of the backup gas generator in every hour. For a microgrid with a 60 kW solar plant, a 20 kW wind plant, a 40 kW backup gas generator and a 50 kW / 200 kWh battery, and critical and non-critical consumers whose maximum load ranges from 40 to 240 kW across six scenarios, the optimal connection power grows almost proportionally with the load, from 17.9 kW up to the 170 kW limit, equal to the maximum possible export. The levelized cost decreases by 2.8% at the lowest load (40 kW) compared with a connection sized for the maximum possible export.
No takes yet. Share an insight, caveat, or question.
Buratynskyi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: