Answers are grounded in this paper and cite their sources.
Firefighters operating in hot-climate regions such as Zimbabwe experience severe physiological heat strain because conventional multilayer turnout gear restricts evaporative and convective heat loss while providing no integrated thermoregulation.This paper presents the conceptual design, initial theoretical proof of concept, and preliminary economic analysis of an intelligent, self-cooling personal protective equipment (PPE)system architecture developed for resource-constrained fire services.Using a design-based engineering methodology informed by field observations, interviews, and a 40-respondent survey at two Bulawayo fire stations, a hybrid low-cost framework was selected from three candidates through a weighted decision matrix. The proposed architecture conceptually integrates an STM32L4 microcontroller, MAX30205 and MAX30102 physiological sensors, a five-state finite state machine controller, and a hybrid thermal management subsystem combining active micro-ventilation (~50 W convective, 5.2 L/s flow rate) with passive phase-change material (PCM) buffering (~30 W conductive heat flux), targeting a theoretical cooling capacity of approximately 80 W. Three-zone conjugate-heat-transfer computational fluid dynamics (CFD) modelling and transient MATLAB/Simulink thermal-electrical process simulations were used to evaluate the conceptual feasibility of the system layout in place of physical prototyping.Computational results demonstrate the theoretical viability of the forced-convection cooling pathway, showing a stable fan-driven pressure gradient and an analytical 4.8-minute (25.0%) extension in the baseline time required to reach the 39°C critical core-temperature threshold defined by NFPA 1584 (increasing from an uncooled baseline of 19.16 minutes to 23.95 minutes under a simulated 400 W metabolic load). Process modeling also suggests a theoretical cycle-averaged battery endurance exceeding eight hours. Preliminary economic modeling indicates a projected batch production cost of USD 260 per unit, with 43.8% of structural components sourceable regionally. These findings provide baseline computational performance estimates that establish the technical plausibility and architectural logic of a locally adapted,intelligent PPE concept prior to physical development
No takes yet. Share an insight, caveat, or question.
Rwaringesu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: