Answers are grounded in this paper and cite their sources.
To address long cantilever hanging, stress concentration, and insufficient backfill capacity in gob-side entry retaining (GER) in thick coal seams with a hard roof, a collaborative “pressure relief–support–backfilling” strategy based on directional hydraulic fracturing roof cutting is proposed. COMSOL phase-field simulations are conducted to investigate hydraulic fracture propagation under varying in-situ stress ratios, natural-fracture intersection angles, and cutting parameters. Results show that hydraulic roof cutting reduces the required backfill width by 30%. The optimal parameters are fracture spacing ≥4.5 m, cutting angle 20°, and boreholes oriented along the maximum principal stress. Field application at the N2302 working face of Gucheng Coal Mine shows that floor heave decreases from 670 to 290 mm, roof subsidence from 580 to 230 mm, and rib convergence from 340 to 180 mm, maintaining entry stability.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: