Answers are grounded in this paper and cite their sources.
Maritime disruptions threaten manufacturing when materials become usable after production deadlines or when recovery capacity is exhausted. This study develops and evaluates a timing-aware decision-support framework linking inbound bookings, protective inventory, reserved transport capacity and feasible production. Matched comparisons distinguish the value of state-responsive replanning, residual protection and production coordination. Ten policies are evaluated on 120 matched ten-week computational episodes, supplemented by 216 factorial and 24 multi-size episodes. Rolling updates reduce mean cost by 19.47% relative to retaining the initial plan; residual protection reduces cost by 3.53% relative to nominal planning. Advantages over persistence and production-first planning remain small and uncertain. A separate 26-week, author-confirmed empirical factory ledger records 22.87% on-time dispatch despite 95.34% fulfilment by cutoff and 96.49% regular-hour utilization. An analytical circularity extension links qualified secondary inputs, delayed recovery, carried work in progress and shared production capacity to physically supported customer dispatch and explicit environmental budgets. A worked example shows that maximizing recovery volume can reduce feasible finished output. The contribution is a decision-structure and evaluation framework, not a new learning algorithm. The findings support deadline-feasible resource decisions; environmental benefits and broader transferability require further comparative evaluation.
No takes yet. Share an insight, caveat, or question.
El-Nakib Islam (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: