Answers are grounded in this paper and cite their sources.
This study investigates critical-speed amplification, stress transfer and rail-pad dynamic load response of CRTS I ballastless track under ultra-high-speed train loads. A three-dimensional vehicle–track–subgrade coupled finite-element model was developed for a CRH380B train and compared with field measurements from the Beijing–Tianjin Intercity line. The direct displacement-amplitude method identifies a displacement-peak speed of approximately 109 m/s for the ideal track–subgrade system. Full-scale tests show a non-monotonic slab-acceleration response, with a main peak near 396 km/h and a secondary peak near 325 km/h. Flexible-sensor measurements over multiple train speeds also show a non-monotonic rail-pad load response, with the maximum measured load occurring near 396 km/h. Numerical results at 110 and 180 m/s indicate that the track slab mainly carries vertical compression and longitudinal tension, whereas the CA mortar layer mainly carries vertical compression and shear. A quantitative fatigue assessment based on the adopted 2 × 106 reference load cycles gives track-slab fatigue utilisation ratios of 0.273 and 0.325 at 110 and 180 m/s, respectively, and a CA-mortar Miner damage index of approximately 2.32 × 10−7 under the most severe calculated compressive stress. These nominal fatigue indices are conditional on the adopted stress inputs and S–N extrapolation and do not establish field service life. The combined numerical and sensing results indicate a common speed range of amplification at both the global structural scale and the local rail-pad load-transfer scale.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: