Answers are grounded in this paper and cite their sources.
Projects are increasingly the delivery vehicle for societal grand challenges — decarbonisation, health system reform, water security, digital inclusion. Yet a familiar pattern recurs: the project closes on time and on budget while the change it was meant to produce arrives late, arrives partially, or decays after handover. This paper argues that such outcomes are not simply failures of execution but symptoms of a structural condition we name temporal misfit: the incongruence between the temporal architecture of a project (its horizon, cadence and planned ending) and the temporal architecture of the change process it is intended to advance. Drawing on the temporary organising literature and on temporal theorising in organisation studies, we develop the construct along three dimensions — horizon, rhythm and terminality — and distinguish it from uncertainty, complexity and schedule overrun. We then specify the institutional and cognitive generators of misfit, four mechanisms through which it damages outcomes (displacement, decoupling, compression and externalisation), and a feedback loop that renders misfit invisible to conventional performance measurement. Finally, we adapt temporal brokerage to project settings, theorising four practice families — horizon spanning, rhythm coupling, terminal redesign and temporal accounting — their complementarities, costs and boundary conditions. Ten propositions, a research agenda and a front‑end diagnostic translate the framework into testable claims and actionable governance design.
No takes yet. Share an insight, caveat, or question.
Majeed* et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: