Answers are grounded in this paper and cite their sources.
This study aims to evaluate the performance efficiency of molding machines using the Overall Equipment Effectiveness (OEE) method and to identify the main causes of production losses through the Six Big Losses approach and a Fishbone Diagram. The data used consist of machine operational records from January to June 2025. The findings show that the average OEE score is 63.08%, below the company’s standard of 75%. The Six Big Losses analysis indicates that the largest losses are attributed to equipment failures, accounting for 63.45%, followed by reduced speed at 12.70% and idling and minor stoppages at 10.79%. In addition, the Fishbone analysis indicates that the main causes of low OEE are related to machine and personnel factors, including hydraulic system malfunctions, machine overheating, and extended setup times resulting from limitations in operator skills. The proposed improvements focus on implementing preventive maintenance, improving operator skills, and standardizing work procedures. Estimates suggest that these improvements could potentially increase the OEE value to 68.6%. The findings are expected to serve as a basis for improving machine effectiveness and production process efficiency.
No takes yet. Share an insight, caveat, or question.
Darius et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: