This study developed a risk-based asset management framework for prioritizing water distribution pipe replacement in the water distribution system of Aliaga Municipality, Nueva Ecija. A two-stage quantitative case-study approach was used. Stage 1 screened 17 service areas using Area Asset Vulnerability (AAV) and Area Service Criticality (ASC). Stage 2 assessed the individual pipes within the selected areas using relative Likelihood of Failure (LoF), Consequence of Failure (CoF), and relative risk. Seven areas proceeded to Stage 2, where a total of 512 pipes were evaluated. The pipe-level CoF was based on the demand deficit obtained from individual pipe-unavailability simulations because the additional pressure-deficient-node indicator did not provide differences among the evaluated pipes. The final risk scores ranged from 2.50 to 25.00. A total of 116 pipe segments or 22.66% were classified as Very High risk, while 113 pipe segments or 22.07% were classified as High risk. Poblacion Area has the highest number of Priority 1 pipes, including all 18 pipes that obtained the maximum risk score of 25.00. Thus, the developed framework provides a practical basis for field verification and future pipe replacement planning even when historical pipe-failure records are not available.
No takes yet. Share an insight, caveat, or question.
Leon et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: