Effective cost control is a critical component of project management and plays a significant role in determining the success of donor-funded public health projects. Despite increased funding from development partners, many public health projects in Kenya continue to experience cost overruns, schedule delays and misallocation of resources that undermine their performance and reach. This study examined the relationship between project cost control and the performance of donor-funded public health projects in Kenya. Project cost control was conceptualized as cost variance analysis, schedule variance analysis and earned value forecasting, while performance was measured through budget adherence, timelines and quality standards. The study was anchored on Earned Value Management Theory and Performance Measurement Theory. It adopted a positivist research philosophy and a descriptive research design. The target population comprised 305 donor-funded public health projects implemented in the counties of the Lake Victoria region of Kenya over the previous five years, from which 173 projects were selected through simple random sampling. A total of 165 questionnaires were returned, representing a response rate of 95.4%. Primary data were collected using structured questionnaires, key informant interviews and non-participant observation, and were triangulated with project reports, financial statements, audit reports and government health sector performance reviews. Quantitative data were analysed using descriptive statistics, correlation and simple linear regression. The findings revealed that project cost control was positively and statistically significantly related to project performance (B = 0.411, β = 0.727, t = 13.518, p < 0.001). The regression model was significant (F(1, 163) = 182.726, p < 0.001), and cost control explained 52.9% of the variation in project performance (R² = 0.529). A one-unit improvement in cost control was associated with a 0.411-unit improvement in project performance. The findings indicate that continuous cost monitoring, variance analysis, earned value forecasting and timely corrective action enhance budget adherence, timely completion and the quality of deliverables. The study concludes that project cost control is a key determinant of the performance of donor-funded public health projects in Kenya. The study recommends that policy makers promote digital cost-control and project-monitoring systems, that implementing organizations institutionalize earned value management and regular variance reporting, and that donors invest in institutional capacity building to strengthen accountability, transparency and value for money.
No takes yet. Share an insight, caveat, or question.
Oburu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: