In regional distribution networks with a high share of distributed PV and ESS, ESS is usually configured according to typical days or worst-case scenarios, and its planned capacity can hardly reflect the voltage regulation capacity actually available during operation. To this end, a method for calculating the adjustable voltage regulation capacity considering response time delay and source–load correlation is proposed. First, a first-order time-delay external characteristic model of the voltage regulation response of distributed PV inverters and ESS converters is established to characterize the corrective effect of control delay and power ramping on instantaneous voltage regulation capability. Second, Copula-function-based models are constructed for the temporal autocorrelation of PV output and the spatial correlation among multiple sites, and are coupled with load demand to generate a joint source-load operation scenario set. On this basis, with the objective of maximizing voltage regulation support capability, a voltage regulation capacity calculation model is established and solved using voltage sensitivity analysis and a piecewise search strategy. Case studies show that the average adjustable capacity in each season obtained by the proposed method is about 0.247–0.657 MVA lower than that obtained by the traditional static method, and is closer to actual operating conditions.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: