Answers are grounded in this paper and cite their sources.
Wellbore stability in deep fractured-vuggy carbonate gas reservoirs constrains drawdown management and completion selection. This study evaluates the Deng-2 Member of Well PT1 using a stage-specific workflow combining the Kirsch solution, Biot effective stress, depth-dependent log-derived parameters, and core tests at high temperature and confining pressure. The Mohr–Coulomb criterion is used for drilling and well testing; an inscribed-circle-matched Drucker–Prager criterion is used for production. Calculated profiles agree with Drillworks in overall trends, major high-risk intervals, and pressure-window positions. Caliper observations provide field comparisons within their depth coverage. At a mud density of 1.230 g/cm3, 5744–5745 m is locally susceptible to shear instability. Minimum allowable testing and production drawdowns both occur at 5744.62 m and are 4.95 and 43.75 MPa, respectively. Actual testing drawdown reaches its calculated limit, whereas actual production drawdown of 5.00 MPa is 38.75 MPa below the production limit. Completion design should prioritize this local weak interval. Subject to stability, isolation, and pressure-bearing requirements, open-hole multistage completion suits water-free intervals requiring differentiated stimulation; uncemented liners suit lost-circulation-sensitive intervals with limited staged stimulation; and cemented-and-perforated liners merit evaluation where water isolation or additional support is needed.
No takes yet. Share an insight, caveat, or question.
Li et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: