Answers are grounded in this paper and cite their sources.
For bridge-deck de-icing in high-altitude regions, abutment energy piles are increasingly used. Owing to canyon topography, pile groups are typically located adjacent to slopes and are therefore subjected to horizontal loading. Existing thermo-mechanical studies on pile groups have mainly focused on axial loading, while research under horizontal loading remains limited. Therefore, a field test was conducted on a 2×2 bridge-abutment energy pile group adjacent to a slope in a high-altitude region. Seven intermittent heating cycles were applied to one pile, and the pile group and cap responses were monitored. Results show that under horizontal loading, operating one pile induced additional stresses and bending moments in non-operating piles, with distributions depending on pile’s positions and the load-transfer path. In the operating pile, the maximum thermally induced bending moment increment occurred in the lower-middle part, unlike the case of a concentrated horizontal force applied to the cap side wall, where the maximum response occurred in the upper part. As thermal cycling continued, the horizontal stress difference across the upper cap layer increased gradually, driven by asymmetric temperature distribution and cap bending, potentially affecting structural stability and warranting attention.
No takes yet. Share an insight, caveat, or question.
Kong et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: