Answers are grounded in this paper and cite their sources.
Adjusting drilling parameters affects both the rate of penetration (ROP) and drill bit wear, making ROP improvement alone an inadequate measure of overall drilling economics. However, incorporating the trade-off between drilling speed and the associated operating and wear costs into parameter optimization remains challenging. This study proposes a framework for jointly optimizing drilling cost and efficiency by integrating a Transformer–bidirectional long short-term memory (BiLSTM) model with multi-objective Bayesian optimization. The framework addresses nonlinear dependencies in drilling sequences and the propagation of prediction errors into parameter selection. Self-attention captures dependencies among sampling positions within the input window, while BiLSTM extracts sequential patterns to estimate ROP. WOB and RPM serve as decision variables, and time-dependent operating costs, energy costs, and bit wear costs are incorporated into cost per unit drilled length. A bi-objective optimization model accounts for predictive uncertainty and engineering constraints, while a rolling strategy recommends parameter ranges derived from near-optimal Pareto solutions. Experimental results show that Transformer-BiLSTM outperforms the LSTM, BiLSTM, and Transformer baselines across all three-evaluation metrics. The mean absolute error (MAE) and root mean square error (RMSE) are 0.5812 and 0.9408 m/h, respectively, with a coefficient of determination (R2) of 0.9515. In the case study of Well A in Block M, the joint optimization scheme increases the average ROP from 53.28 to 64.14 m/h, representing a 20.39% improvement. The number of bit replacements decreases from three to two. Compared with the scheme that optimizes ROP alone, the joint optimization scheme reduces total costs by 36.73%. It also achieves a higher drilling rate than the scheme that minimizes cost alone. By balancing ROP and operating costs, the proposed framework supports drilling parameter selection that jointly addresses drilling schedule requirements and economic objectives.
No takes yet. Share an insight, caveat, or question.
徐建明 et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: