Answers are grounded in this paper and cite their sources.
Tunnel boring machine (TBM) excavation in competent jointed or faulted rock can produce delayed fracture activation, intermittent slip, and migrating microseismic activity that are difficult to interpret from quasi-static excavation stages alone. This study develops a reduced-order nonlinear model in which a moving excavation disturbance acts on two mechanically coupled rock domains with nonlinear friction, delayed interaction, and a slowly evolving memory variable representing cumulative weakening. Numerical simulations identify a robust stable-selective-coupled transition: the downstream domain may activate before the full system, and near-critical cases exhibit clustered events long after local face passage. TBM advance rate has a non-monotonic influence, with memory-dominated instability at low rates, a narrow intermediate stabilization interval, and renewed impulsive activation at higher rates. Delay and memory parameters shift the transition boundaries and may either amplify or suppress the response. Qualitative comparison with published TBM monitoring studies shows field analogues for delayed post-passage activity, event clustering, and structural localization, whereas selective downstream activation and the non-monotonic advance-rate response remain testable predictions. The results provide a mechanism-oriented basis for interpreting temporal and spatial precursor patterns in structurally controlled TBM tunnel sections.
No takes yet. Share an insight, caveat, or question.
Srđan Kostić (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: