Answers are grounded in this paper and cite their sources.
Phosphogypsum (PG), a calcium sulfate-rich by-product of wet-process phosphoric acid production, is increasingly considered as a substitute for natural gypsum (NG) in cementitious systems. However, raw PG is not a direct NG equivalent because soluble phosphate and fluoride species, residual acidity, heavy metals, radionuclides, particle morphology, and source variability can disturb sulfate release, retard clinker hydration, alter ettringite and C–S–H formation, and create environmental compliance concerns. This structured critical review evaluates FeSO 4 modification as a coupled sulfate–redox–hydration strategy for PG-based gypsum substitution. A five-level hierarchy distinguishes direct FeSO 4 evidence (Level 1) from Fe-bearing sulfate analogues (Level 2), general PG evidence (Level 3), model-based evidence (Level 4), and review/background evidence (Level 5). Direct evidence supports sulfate supply and Cr(VI) reduction in selected cement formulations. FeSO 4 may also participate in selected phosphate- and fluoride-related immobilization pathways; however, this remains a testable hypothesis because direct Level 1 evidence is currently insufficient. Reported improvements in setting control, strength development, and pore refinement depend on the PG source, binder system, and FeSO 4 dosage. Most Level 1 evidence derives from a small number of studies, substantially including work from the same research team. Independent external replication is therefore limited. Industrial implementation requires standardized PG characterization, mechanism-based dosage design, matched NG/raw PG/modified PG controls, long-term durability testing, standardized leaching and radiological validation, and pilot-scale quality control.
No takes yet. Share an insight, caveat, or question.
Mend et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: