Answers are grounded in this paper and cite their sources.
Underground hydrogen storage (UHS) offers a pathway to large-scale temporal decoupling of intermittent generation and demand. This motivates an integrated energy-management problem in which the storage is operated jointly with renewable supply, contractual demand, and external dispatch power. Unlike battery-type storage, UHS in porous formations is governed by a spatially distributed, partially observed subsurface state. Together with nonlinear multiphase flow dynamics, this means that neither working-gas availability nor deliverability can be reliably inferred from real-time measurements alone; both depend on the full subsurface state and its operational history. In addition, withdrawal may trigger co-production of native fluids (e.g., brine), imposing handling/treatment costs that rise sharply once such regimes are entered. UHS scheduling is therefore a nonlinear, path-dependent control problem with state-dependent constraints that necessitates multiphase flow models in the decision loop. We present a finite-horizon simulation–optimization framework for integrated energy–UHS scheduling, designed to be applied repeatedly in a rolling-horizon manner. Over each planning horizon, the framework generates an optimal hydrogen rate schedule given forecasts of renewable supply, demand, hydrogen–electricity conversion efficiency, and the cost of external dispatch power. The objective minimizes the total operational cost comprising (i) external energy purchase, (ii) injection/compression costs, and (iii) a nonlinear discharge penalty associated with unwanted fluid co-production. The storage response within each horizon is evaluated using dynamic multiphase flow models, and the resulting non-smooth optimization problem is solved with the covariance matrix adaptation evolution strategy (CMA-ES). The framework is tested using three case studies of increasing physical realism and time horizon (weekly to yearly), all two-phase two-component (H 2 –brine): (1) a fast analytical piston-displacement toy model; (2) a 2D single-well simulation; and (3) a 3D heterogeneous multi-well model based on PUNQ-S3 adapted to H 2 –brine. Across all cases, the optimized schedule consistently outperforms a reactive baseline that switches to external supply when water-handling becomes unfavorable, with total-cost reductions of ∼ 0.5%, ∼ 2.4%, and ∼ 1.4% from Cases 1 to 3, and water-treatment cost reductions of 63%, 27%, and 28%. These results demonstrate the importance of explicitly accounting for state-dependent subsurface dynamics in UHS operation. More broadly, the proposed framework provides a practical pathway for integrating high-fidelity subsurface simulation into energy system optimization, enabling more reliable and cost-effective utilization of geological hydrogen storage.
No takes yet. Share an insight, caveat, or question.
Sayyafzadeh et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: