Answers are grounded in this paper and cite their sources.
Hospitals must commit beds, staff, medicines and equipment before they know how many patients will arrive, and a plan built on average demand may fail exactly when demand surges. This paper develops a two-stage adjustable robust optimization model for the integrated allocation of these four resources under uncertain, class-specific patient arrivals and limited capacity. First-stage capacities are fixed before the planning horizon; second-stage admission, overtime and emergency-procurement decisions respond to arrivals observed up to each day and are restricted to non-anticipative linear decision rules. Arrival uncertainty is described by a budgeted polyhedral set whose budget Γ controls the number of classes that may simultaneously reach their worst case in a day. The robust counterpart is an exact linear program. Four formal results are established: dualisation of the budgeted constraints, feasibility and attainment of the optimum, monotonicity in the budget, and a Hoeffding-based calibration rule that also shows when a probabilistic guarantee is uninformative. In a synthetic three-class hospital instance, the robust counterpart was verified on 3,000 sampled scenarios (maximum constraint violation 1.8 × 10⁻¹⁵) and compared with a nominal model and a sample average approximation on 2,000 out-of-sample scenarios under a non-anticipative admission policy. With the budget Γ = 1.5, the rejection rate fell from 10.8% to 2.7% and the tail cost (CVaR at 95%) by 3.9%, at a 6.2% higher mean cost. When the diversion penalty is doubled the robust design is 7.3% cheaper than the nominal one, and under a shifted demand law with a doubled penalty it outperforms the sample average approximation in mean (1.6%) and tail (5.6%) cost.
No takes yet. Share an insight, caveat, or question.
Ochonogor et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: