Answers are grounded in this paper and cite their sources.
Purpose Rainfall-triggered failures of railway embankments, cuttings and adjacent slopes are managed through rainfall thresholds, geotechnical assessment, monitoring and operating rules, but these elements are often evaluated separately. This review examines how the railway-earthwork evidence progresses from rainfall exposure through hydrologic state and physical response to operational action. Design/methodology/approach A structured critical evidence review was reconstructed from 596 screened records. Of 274 records advanced to the full-text stage, 105 verified full texts were assessed, 20 were excluded after full-text review, 169 had no verified full text and 85 studies were retained. Primary-objective coding was retained for description, while the principal synthesis used non-exclusive study-level coding of rainfall, hydrologic-state, response, operational and validation variables. Findings The retained corpus was predominantly railway-direct (83/85). Primary objectives were mechanism/stability response (29), threshold/risk prediction (28), mitigation/rehabilitation (15), monitoring/condition assessment (8) and operational warning/decision (5). Across all studies, stability/failure evidence appeared in 76, infiltration/seepage in 50 and deformation/displacement in 43. Thirty studies contained an explicit operational action, but only 9 of those reported validation, 3 reported non-failure controls, 1 reported a false-alarm metric, 1 a missed-event metric and none reported a lead-time metric. Practical implications For railway infrastructure managers, rainfall thresholds are best treated as network-level screening tools unless route-specific calibration and asset-state information support stronger decisions. Operational studies should report verified non-failure exposure, false alarms, missed events and usable lead time before a threshold, model or sensor output is relied upon for inspection, restriction, closure or resumption. Originality/value This railway-earthwork-specific study-level evidence-maturity synthesis quantifies where the published evidence remains strong in physical understanding but weak in validated decision support, and identifies the reporting evidence required to move from hazard prediction to defensible railway action.
No takes yet. Share an insight, caveat, or question.
Ghimire et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: