In district cooling plants, forecast-based dispatch usually takes the forecast load as its reference. When the forecast carries a persistent bias, supply and demand remain mismatched even when the optimizer returns a feasible schedule. This study adds an online load-correction layer to an existing genetic-algorithm (GA) dispatch optimizer, without modifying it, that feeds the tracking error of the completed hours back into the reference load. Under identical forecasts, equipment models, constraints and information timing, three correction methods of increasing complexity are compared, namely fixed-gain proportional–integral control (fixed PI), gain-scheduled PI (GS-PI) and soft actor–critic (SAC). All models and parameters are frozen on the 2024 cooling season and evaluated in five forecast-error scenarios of the 2025 season. All three methods reduce tracking error in every scenario. Under natural forecast error (130 days), undersupply and oversupply fall together and tracking error drops from 19.0 % to 9.4 %–9.8 % of the mean demand, roughly a halving. SAC is best under the four controlled disturbances, with mean absolute error (MAE) 4.1 % below GS-PI and 12.8 % below fixed PI under random error. GS-PI is best under natural forecast error, 4.0 % below fixed PI and 1.7 % below SAC. SAC needs about 10 2 times the operations of the PI-type methods per decision and about 10 4 times the offline training operations of GS-PI, a large increase in complexity but limited gain. GS-PI offers the best balance between performance and complexity, providing a basis for deciding whether an existing plant should add a correction layer and which method to adopt.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: