Answers are grounded in this paper and cite their sources.
Offshore wind is moving to larger turbines, deeper water and floating foundations while developers remain under pressure to reduce the levelised cost of energy (LCOE). This article presents a transparent, reproducible scenario model that links turbine reliability, availability, energy yield and LCOE, and it quantifies how much of a projected cost reduction comes from reliability and turbine scale and how much comes from exogenous cost and financing assumptions. Subsystem failure rates representative of a 97-turbine onshore fleet of 1.5 MW turbines are translated offshore with published stress factors and extrapolated to 8 MW and 15 MW ratings with explicit scaling laws. A Monte Carlo failure-and-repair simulation (10,000 turbine-years, fixed seed) returns availability, which enters the net capacity factor and hence the LCOE. Four scenarios are analysed: the onshore reference (S1), its offshore translation (S2), a 640 MW fixed-bottom farm (S3) and a 900 MW floating farm (S4). Central LCOE values are 119, 79.5 and 65.8 €/MWh for S2–S4, with input-uncertainty 90% intervals of 102–141, 68–95 and 56–88 €/MWh. A Shapley decomposition attributes the 53 €/MWh reduction from S2 to S4 to gross capacity factor (− 17.8), O&M cost per MW (− 15.4), CapEx per MW (− 14.1) and financing terms (− 13.8), partly offset by lower availability (+ 7.4). WACC, capacity factor and CapEx are the three most influential inputs in every offshore scenario, with failure rate fourth. The ranking S4 < S3 holds for mechanical scaling exponents up to about 0.8 but only if floating CapEx stays below 2.7 M€/MW; S3 and S4 are therefore conditional projections, not forecasts.
No takes yet. Share an insight, caveat, or question.
Piquero et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: