Answers are grounded in this paper and cite their sources.
Unified synthesis of 7 preregistered hardware campaigns (TMAP-02–TMAP-05, RO-06, RO-07, and CN-01) comprising 42 IBM Quantum jobs, 904 PUBs, 1,851,392 physical circuit shots, and 873 s QPU time across all three 156-qubit IBM Heron r2 processors (ibm_marrakesh, ibm_fez, and ibm_kingston). 90-Minute Three-Processor Layout Sign Reversal (TMAP-02..05): Repeating the identical 40-qubit, 39-CZ probe-guided vs calibration-guided path comparison 85–90 minutes apart inverted sign on all three processors (+25.0→−3.0 pp on ibm_marrakesh, −3.6→+6.9 pp on ibm_fez, −0.3→+7.8 pp on ibm_kingston), while tensored readout mitigation restored calibration-path superiority on every device. Stale Calibration Snapshots, Not Multiplexing Crosstalk (RO-06/07): Hidden readout faults (>15% actual vs <3% published) all recovered below 5% (8/8 intermittent), persisted at 58.3% across 15-minute rounds (Fisher OR = 365, p = 3.2e-18) while backend calibration snapshots stayed static up to 16.2 h, and showed ≤1.12 pp simultaneous-readout multiplexing shift. Colored-Noise Nulls vs White-Noise Misspecification (CN-01): Across 10 couplers ≥5 hops apart (499,712 circuit shots), white-noise GLS selected a non-local OU bath by ΔBIC = 10,263 before failing its preregistered held-out coupler gate (p = 0.82); 350 synthetic replicates prove white-noise nulls misclassify 100% of local 1/f dephasing, whereas local colored-noise nulls cut false positives to 0%. Includes standalone PDF preprint, macro-locked REVTeX 4.2 source, vector figures, deterministic generator, and RFC 8785 canonical reproducibility capsule binding all 42 hardware job IDs.
No takes yet. Share an insight, caveat, or question.
Devin Phillip Davis (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: