Artificial intelligence data centers need large amounts of firm electricity. The companies that build them have turned to nuclear power in public. This review asks whether small modular reactors (SMRs) can meet that need, and on what timescale. It draws on demand forecasts, hyperscaler agreements, licensing records, cost models, fuel supply evidence, grid queue data, and alternatives. United States data centers used 176 TWh in 2023, about 4.4 percent of national electricity. The Lawrence Berkeley National Laboratory 2025 Update puts the 2030 Reference Case at 649 TWh, with a range of 521 to 843 TWh. The signed SMR frameworks are real: Google with Kairos Power for up to 500 MWe by 2035, Amazon with X-energy for a 320 MWe first project and a 5 GW aim by 2039, Meta with TerraPower for up to 2.8 GW, and Meta with Oklo for a 1.2 GW campus. None of those reactors is operating. The only United States construction permits for SMR and advanced reactor projects in hand are Kairos Hermes and Hermes 2, TerraPower Kemmerer Unit 1, Tennessee Valley Authority Clinch River Unit 1, and Dow and X-energy Long Mott Generating Station. Costs are first-of-a-kind and uncertain. Modelled overnight costs near 6,200 dollars per kW fall only after 10 to 20 repeated builds. The one fully priced United States SMR project, NuScale and Utah Associated Municipal Power Systems, was cancelled in 2023 after its cost rose to 9.3 billion dollars. High-assay low-enriched uranium supply sits at demonstration scale. Behind-the-meter siting did not remove grid and regulatory risk. The verdict is conditional. SMRs are a credible long-horizon option for AI data-center power in the 2030s if permits, fuel, and cost learning hold. They are not a near-term fix. They are not proven today.
No takes yet. Share an insight, caveat, or question.
Artem Melnyk (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: