Answers are grounded in this paper and cite their sources.
Road maintenance in Tanzania is increasingly delivered by private contractors, but their performance is inconsistent and is assessed through ad hoc, subjective supervision. In Arumeru District, the Tanzania Rural and Urban Roads Agency (TARURA) manages about 1,451 km of roads without a systematic model linking contractor performance to road maintainability. Drawing on the resource-based view of the firm, this study developed and tested a contractor performance tracking model for TARURA in Arumeru District. A quantitative case study design was adopted. The dataset comprised 166 observations: questionnaire responses from 73 contractors in Contractors Registration Board Classes I–VII and 20 TARURA technical staff, and a documentary review of 73 road maintenance projects executed in 2020–2025. Twelve technical factors were ranked using the Relative Importance Index (RII). Seven met the threshold of RII ≥ 0.75, led by quality control procedures (0.869), compliance with materials standards (0.860) and technical qualification (0.857); all seven are human-capital or organisational capabilities, whereas equipment availability, a resource that can be hired, ranked lowest (0.331). The seven factors were used as predictors in a multiple linear regression model. Because recorded maintainability outcomes were not available for every observation, the dependent variable used for estimation was simulated from the factor ratings with random error, and the procedure was tested on a 70/30 training–test split (R² = 0.856 and 0.867), which shows that the estimation is stable but does not measure accuracy on real roads. In a preliminary field check, the model ranked five contractors in the same order as their recorded performance scores and placed each in the same performance class, but over-predicted every score by 1.9–4.5 percentage points. The model is a transparent scoring tool that TARURA can pilot for contractor monitoring; it must be re-estimated and validated with recorded maintainability outcomes from a larger sample that includes average and poor performers before it is used for pre-qualification or contract award.
No takes yet. Share an insight, caveat, or question.
Bakari et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: