Answers are grounded in this paper and cite their sources.
Pavement slabs at Inland Container Depots (ICDs) carry some of the heaviest and slowest loads in the logistics chain, yet at the Dar es Salaam dry ports their maintenance remains largely reactive, resulting in premature distress, unplanned downtime, and high life-cycle costs. Construction quality and maintenance records for 2020–2024 exist but have not been used to predict pavement performance, and no validated model is available for ICD pavements. This study developed and validated a predictive maintenance management model for ICD pavement slabs at the Dar es Salaam dry ports. A quantitative, cross-sectional design was adopted. Fifty pavement sections were selected by stratified random sampling and rated on fourteen candidate deterioration factors using field tests and calibrated five-point descriptors, supported by a structured questionnaire administered to ICD key informants and a review of 55 maintenance records. The factors were ranked with the Relative Importance Index (RII), and those with an RII of at least 0.70 were entered into an ordinary least squares multiple linear regression model calibrated on 35 sections and tested on 15 holdout sections. Eight factors were retained: compaction level (RII = 0.932), axle load magnitude, container throughput volume, subgrade bearing capacity, heavy vehicle frequency, pavement layer thickness, material quality and workmanship, and maintenance frequency, whereas the environmental factors, container stacking load, and time since last maintenance ranked low. The model explained 98.1% of the variance in the training data (adjusted R² = 0.975; F = 170.0; p < 0.001), and its predictions agreed closely with observed values. Traffic-demand factors reduced performance, while compaction, structural capacity, material quality, and maintenance frequency improved it. Scenario analysis produced predictions from 12.34% to 94.74% that fell consistently within the expected performance bands. The model gives ICD operators an interpretable tool for prioritising sections, scheduling preventive maintenance and allocating budgets.
No takes yet. Share an insight, caveat, or question.
Ali et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: