Answers are grounded in this paper and cite their sources.
Precast Concrete I-Girder (PCI girder) bridges are typically utilized for short to medium spans due to their ease of construction. However, the demand for longer spans and sustainability in bridge construction has prompted the use of higher-performance and lower-carbon-emitting materials in constructions. Materials like Ultra-High Performance Concrete (UHPC) offer high levels of strength and durability to the bridges, while Ground Granulated Blast Furnace Slag (GGBFS) reduces the amount of cement. This study investigates the use of UHPC with GGBFS in PCI girder bridges. A comparison between a conventional concrete two-span bridge and a UHPC with GGBFS single-span bridge is conducted, including their structure, the amount of material required for construction, construction costs, carbon emissions, and construction duration. The structural analysis of the bridges was performed using Midas Civil 2025. Material take-off and cost estimation was performed using Indonesian Unit Price Analysis (called Analisis Harga Satuan Pekerjaan or AHSP). The environmental impact was assessed through cradle-to-gate Life Cycle Assessment (LCA) analysis. The results indicate that the use of UHPC with GGBFS allows for a single-span bridge of the same dimensions as the two-span concrete bridge, whereby it requires less reinforcement and reduces carbon emissions of 9.77% due to the elimination of the middle pier. While construction costs for the UHPC with GGBFS bridge are higher, construction time is shortened from 51 to 38 weeks due to the elimination of the bridge pier. Overall, the use of UHPC with GGBFS provides structural, sustainability, and construction time benefits but at a higher cost.
No takes yet. Share an insight, caveat, or question.
Alfanov et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: