Answers are grounded in this paper and cite their sources.
Accurate prediction of actual safety and health management expenses (SHME) is essential for safety compliance and cost efficiency in water-supply construction projects. Although the Korean government has set standards for SHME calculations, they do not sufficiently address diverse site characteristics, causing potential delays and increased safety risks. To the best of the authors’ knowledge, this is the first study to systematically incorporate specific characteristic factors of water-supply projects to address these issues. A comprehensive comparative analysis of multiple machine learning models is conducted using real project data from the Korean public enterprise K-water to enhance accuracy through hyperparameter optimization. The results confirm the superior accuracy of the optimized artificial neural network model, which achieves a mean absolute percentage error of 0.28%. SHAP analysis reveals transparent variable influences, indicating further strengthening of framework interpretability. The proposed model provides risk-informed SHME predictions during project initiation and bidding phases with limited preliminary information. This capability helps owners and contractors identify funding shortfalls early and proactively develop effective safety strategies, reducing accidents, claims, and delays. Further, this study confirms that the data-driven dynamic rate prediction approach enhances safety budget allocation efficiency, offering critical quantitative evidence for regulatory authorities to optimize future rate policies.
No takes yet. Share an insight, caveat, or question.
Hong et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: