Public buildings in many Tanzanian local government authorities deteriorate prematurely because maintenance is reactive and weakly prioritised. This study developed and validated a framework for evaluating maintenance factors affecting defect occurrence in public buildings in Itilima District, Simiyu Region. Three specific objectives guided the work: (i) to identify and rank the maintenance factors affecting defect occurrence in public buildings; (ii) to develop a model for assessing maintenance risk at building level; and (iii) to validate a practical framework for evaluating maintenance factors and supporting maintenance prioritisation. A cross-sectional mixed-methods design combined a questionnaire completed by 28 of 32 targeted maintenance professionals (88%) with physical condition audits of 42 of 52 sampled public buildings (81%). Twelve factors were ranked using the Relative Importance Index (RII), and four were combined into an RII-weighted risk index. Of the audited buildings, 21.4% were in good, 42.9% in fair and 35.7% in poor condition. Inadequate funding, lack of written maintenance policies and occupant negligence or delayed reporting tied as the highest-ranked factors (RII = 0.929 each), followed by lack of staff training (RII = 0.921), whereas substandard repair materials ranked lowest (RII = 0.550). Peeling paint and dampness were the most frequent defects (RII = 0.886), and the composite Defect Occurrence Index was 4.071 on a five-point scale. Normalising the RII values gave weights of 0.278 each for budgetary deficits, absence of maintenance guidelines and delayed reporting, and 0.165 for substandard materials. The framework scores each building from 1 to 5 on these inputs, classifies the weighted index into Green (< 2.5), Amber (2.5–3.8) and Red (> 3.8) tiers, links each tier to prioritised actions and feeds results back through a monitoring loop. In five illustrative profiles, the index ranged from 1.00 to 5.00, and tier assignments were unchanged under equal weighting. Expert ratings produced a Composite Validation Index of 4.295 out of 5 (RII = 0.859), with accuracy rated highest (RII = 0.907). The framework gives district engineers a transparent basis for risk screening and maintenance budget prioritisation, subject to field calibration.
No takes yet. Share an insight, caveat, or question.
Kilumile et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: