Project-driven supply networks execute one-off milestone requirements through temporary inter-firm structures. Their resilience depends on the synchronisation of material flows, settlement timing and participant responses as schedule pressure accumulates. Existing models usually analyze these processes separately, limiting explanations of how local operational and financial responses jointly shape completion and project value. This study develops a rule-based decentralised agent-based model that integrates schedule-generated demand, production, replenishment, shipment, settlement and operating-value accounting in a period-by-period logistics-cash-value architecture. Completion and project operating balance are evaluated alongside process diagnostics across phases and tiers. Experiments calibrated to an engineering project compare normalised star and hierarchical networks, feedback configurations and governance arrangements. Hierarchical coordination accelerates baseline completion while generating substantially greater demand-gap and inventory exposure. Process trajectories attribute this divergence to work-package staging, which improves closing-stage input synchronisation and shifts waiting materials and unmet obligations inside the network. Production interruption is the main deterioration channel. The settlement–shipment response preserves continuity, with terminal benefits determined by whether protected output reaches the critical input path or accumulates as staged inventory. The framework enables mechanism-based stress testing, schedule optimisation and in-execution risk warning.
No takes yet. Share an insight, caveat, or question.
Xiang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: