Answers are grounded in this paper and cite their sources.
Most project duration forecasting methods adopt a project level approach by predicting total project duration without explicitly accounting for activity level variability. This limits their ability to capture uncertainty driven by activity specific characteristics. In contrast, activity level approaches forecast durations for individual activities by explicitly modeling activity specific risks. This study proposes alternative activity level risk models that use activity indicators to represent network and resource related risks. The models either aggregate these indicators to forecast project duration directly or predict activity durations then schedule the project to obtain a predicted total duration. We evaluate these models across multiple settings and compare them with an existing project level risk model. The results show that the advantage of forecasting all activities individually is concentrated under high duration uncertainty while forecasting only a subset of activities is preferable in parallel projects with scarce resources. However, under low duration uncertainty and for larger projects, project level forecasting is the most accurate. We summarise these conditions into a guideline for selecting the appropriate risk model and further assess the findings using real life project data.
No takes yet. Share an insight, caveat, or question.
Altuncan et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: