Answers are grounded in this paper and cite their sources.
This study analyzes the executive process of cast-in-place concrete walls, the predominant technology today in Brazilian social housing due to its execution speed and lower unit cost. The effectiveness of the system, however, depends on strict process control, and this challenge grows in humid equatorial regions such as Manaus/AM, where heat, high humidity and intense solar radiation accelerate the loss of workability of fresh concrete and favor plastic shrinkage. Based on an integrative literature review and on documentary analysis of ABNT NBR 16055, the text systematizes the normative requirements for the stages of formwork, reinforcement, placement, compaction, finishing, curing and form removal, and correlates them with the environmental conditions of the Amazon. As a contribution, it proposes a matrix of good executive practices adapted to Manaus, with emphasis on thermal control of fresh concrete (32 °C limit at placement), prevention of plastic shrinkage and prolonged chemical and wet curing.
No takes yet. Share an insight, caveat, or question.
Souza et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: