Answers are grounded in this paper and cite their sources.
The University of the Philippines Los Baños operates twelve electric minibuses (eLBeep), whose removable 5.4 kWh lithium iron phosphate battery packs are charged off-board. This case study uses HOMER Grid to compare five grid-connected combinations of solar photovoltaics (PV), a 10 kW wind turbine, and a battery energy storage system (BESS) for a dedicated charging station against a grid-only base case over 25 years and under a flat energy tariff of USD 0.24/kWh. The charging load is 52.0 MWh per year with a 17.4 kW peak. Without compensation, 40 kW of PV with 72 kWh of storage has the lowest net present cost (NPC; USD 123,919, 34% below the grid-only base), meets 78% of the load on site, and reduces gross grid-related CO2 emissions by 78%. Solar-only at the same PV size costs USD 17,794 more. Wind adds cost at this site, where the turbine’s capacity factor is 7.7%, and storage without PV did not provide returns under either tariff tested. Under the flat tariff, the ranking depends on export credit: at the net-metering rate of about USD 0.13/kWh, solar-only becomes least-cost. Under the MERALCO General Service B tariff, which adds a demand charge, solar–BESS is the least-cost, with or without export credit. Solar–BESS remains least-cost across the tested ranges of the component cost, discount rate, project lifetime, tariff, and fleet size. The findings are specific to the modeled tariff, costs, and site.
No takes yet. Share an insight, caveat, or question.
Lit et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: