Answers are grounded in this paper and cite their sources.
Construction risk analysis is frequently based on expert opinion surveys or hypothetical modeling scenarios, with limited use of implementation-phase documentation from real public infrastructure projects. This study presents an empirical risk analysis of 146 transportation construction projects administered by the Connecticut Department of Transportation, representing approximately $1.5 billion in construction value. The novelty of this research lies in integrating field-documented risk statements recorded during project execution with probabilistic cost modeling using Monte Carlo simulation (MCS). A qualitative content analysis identified 297 risks categorized into nine major groups. For each category, the risk associated with the highest observed cost escalation was modeled using lognormal-based MCS to estimate probabilistic cost variability. Results indicate that construction and design-related risks account for nearly half of all identified risks, while utility relocation, design changes, contractor quality control, and stakeholder concerns were associated with the highest cost increases, ranging from 12% to 22%. Probabilistic modeling demonstrates how these dominant risks contribute to cost uncertainty and contingency requirements. By linking implementation-phase risk documentation with quantitative simulation, this study provides an empirical framework for improving risk-informed budgeting and contingency planning in transportation infrastructure projects.
No takes yet. Share an insight, caveat, or question.
Shaker et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: