Answers are grounded in this paper and cite their sources.
Novel scheduling approach optimizes workload and LF-SMR output, reducing carbon-free energy usage in datacenters.
The rapid rise of AI applications has driven datacenters to unprecedented energy demands, which has prompted major tech companies to adopt on-site nuclear power plants (NPPs) alongside grid electricity. While existing research focuses on off-site NPPs in multi-energy systems optimized for investment returns, recent advances in small modular reactors (SMRs), particularly load-following SMRs (LF-SMRs), offer flexible, reliable power tailored for datacenter co-location. However, LF-SMRs are governed by a set of physical constraints, such as ramp rate and stability limits, making them unsuitable as fully dispatchable sources. This paper proposes a novel day-ahead workload scheduling approach that jointly coordinates datacenter operations and LF-SMR output, explicitly modeling these constraints. We develop a two-stage formulation that forecasts carbon-free grid energy from the grid using conformal prediction in the first stage and then optimizes LF-SMR output and workload scheduling via mixed-integer programming in the second stage. Evaluation on real workload traces shows that our method reduces carbon-based energy consumption by up to 43.44% compared to baselines that omit nuclear integration or ignore SMR limitations.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: