Answers are grounded in this paper and cite their sources.
Improving transportation accessibility on islands is closely related to regional development. Currently, the government is constructing Ulleung Airport as part of the 6th Airport Mid- to Long-term Development Plan. Similar to the case of Jeju Airport in 2016, severe congestion occurs at passenger terminals upon flight resumption after cancellations at airports on islands. Therefore, considering the cancellation rate at island airports is important. This study investigates the conditions leading to increased cancellation rates at Ulleung Airport, with the research results predicting frequent cancellations during the winter season. The research methodology involved examining airport construction plans, aircraft performance, airport de-icing capabilities, and also included consideration of weather conditions. Ulleung Island is a representative snowfall area, and sufficient snow removal capacity must be secured. However, the current plan
No takes yet. Share an insight, caveat, or question.
Lee et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: