Answers are grounded in this paper and cite their sources.
Observational analysis improved resource utilization in reservoirs, suggesting enhanced oil recovery through strategic water injection.
An integrated subsurface re-development strategy is presented in this work for a reservoir which has been under 20 years of miscible HC WAG injection and characterized by low permeability and large transition zone. One of the keys to developing such reservoir is to continuously ensure the establishment of an effective displacement system. The study aims to enhance the field's production and recovery through a series of phased projects, including conversion to full water injection, with a focus on optimizing well spacing. The redevelopment plan is anticipated to maximize oil recovery while minimizing dependency on HC gas consumption and maintaining reservoir pressure. The currently implemented development plan has been facing several complexities and challenges including maintaining miscibility conditions, sustainability of production and injection, associated operating costs and expansion of field development in reservoir extensions. An assessment of multiple alternative field development options is conducted to tackle field management and reservoir challenges. The workflow is initiated by evaluation of historical reservoir management, HCWAG and CO2 injection practices to identify areas for improvement and accelerate decision making process. The identified areas of improvement are incorporated into a dynamic model via diverse set of field management logics to screen a wide range of parameters. This involves running tens of simulation scenarios to evaluate converting the field to full water injection, CO2-WAG, combinations of WI and CO2-WAG or delayed HC/CO2 WAG implementation. The study also assessed the impact of well spacing (750, 375 and 250 m spacing) and higher offtake rates on production performance. Sensitivity analyses are performed to determine the optimal development setup, including vertical placement of wells and the use of maximum reservoir contact (MRC) wells. In the final step, optimal scenarios are compared to existing business plan and later selected, in line with strong economic indicators, honoring operational constraints, corporate strategic objectives. The results are analyzed using standardized approach where several key indicators were cross-referenced to produce an optimal field redevelopment scenario with regards to balanced pressure depletion, harmonized sweep as well as robust discounted cash flow. The results indicate that delayed WAG scenarios can demonstrate comparable results to the WAG from day-1 scenarios, with a shorter production plateau but higher recovery. Full WI cases with a carefully studied ramp-up and shorter spacing can also produce an economic scenario, as they offer a balance between production performance and resource utilization. De-risking activities are put in place to confirm the outcomes ahead of full field implementation. The adopted workflow applied in this study uses a comprehensive dynamic modeling workflow to tackle reservoirs challenges relating to WAG performance, generating alternative development options and leveraging advanced field management logics.
No takes yet. Share an insight, caveat, or question.
Alklih et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: