This research introduces a mathematical framework for transforming E-BOM to M-BOM in shipbuilding, suggesting improved data management.
This paper presents a mathematical framework for defining and managing the transformation between engineering bill of materials (E-BOM) and manufacturing bill of materials (M-BOM) specifically within shipbuilding. Unlike traditional manufacturing sectors, shipbuilding exhibits substantial differences in data structures between E-BOM and M-BOM due to unique design and production processes. To address this complexity, we introduce a mathematical formulation based on mapping functions: a partition mapping (φ) and a hierarchy reconstruction mapping (Ψ). The partition mapping systematically defines how each component in an E-BOM is divided or consolidated in the corresponding M-BOM. The reconstruction mapping translates parent-child relationships from E-BOM structures into production-oriented M-BOM configurations. Through the application of these mappings, we provide a unified, flexible theoretical framework for clearly expressing transformations between diverse BOM structures. The validity and applicability of the proposed formulation were verified using a simplified ship hull model, demonstrating consistent and practical representation of various E-BOM granularities into an M-BOM. Our results confirm that this mathematical framework effectively captures and streamlines the transformation process, providing a solid foundation for optimized data management and future system integration within shipbuilding PLM systems.
No takes yet. Share an insight, caveat, or question.
Matsuo et al. (2025) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: