Answers are grounded in this paper and cite their sources.
Evaluates grid renovation effectiveness in provincial power grid, suggesting improved performance outcomes.
Renovating the grid structure by converting existing transmission lines into VSC-HVDC transmission lines can address issues such as limited transmission capacity and excessive short-circuit current in load-concentrated areas. To effectively evaluate the effectiveness of grid structure renovation and provide a reference for selecting suitable renovation sites, this paper proposes a comprehensive evaluation method for assessing the effectiveness of grid structure renovation. Firstly, an evaluation indicator system is constructed from four aspects. Then, the Fuzzy Analytic Hierarchy Process (FAHP) and Entropy Weight Method (EWM) are used to determine the subjective weight and objective weight of each indicator, and a game theory-based combined weighting method is applied to obtain the combined weight, which is then used to calculate the comprehensive evaluation value before and after renovation to reflect the effectiveness of the renovation. Subsequently, the TOPSIS method is employed for comparative verification of the evaluation method’s validity, and a sensitivity analysis is conducted on the subjective weight to confirm the method’s robustness to subjective preference. Finally, based on the indicator data obtained from the PSD-BPA simulation, the effectiveness of renovating eight scenarios in a provincial power grid is evaluated. The results show that grid structure renovation can enhance power grid performance in load centers.
No takes yet. Share an insight, caveat, or question.
Jin et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: