Answers are grounded in this paper and cite their sources.
This paper addresses the finite-time and fixed-time bipartite average tracking (BAT) problems in multi-agent systems (MASs) subject to bounded disturbances. A novel non-smooth protocol is first constructed on the basis of utilizing the finite-time control method, which can realize the finite-time BAT with structurally balanced graph. Then, the fixed-time BAT problem is dealt with nonlinear fixed-time algorithm, the setting time of which is obtained without depending on initial states. By employing Lyapunov stability theory, some sufficient criteria are obtained to achieve the finite-time and fixed-time BAT for MASs with disturbances. Numerical examples are finally developed for illustration.
No takes yet. Share an insight, caveat, or question.
Han et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: