Randomized trial demonstrates improved construction schedule and quality in concrete rolling construction, suggesting enhanced project management efficiency.
Construction schedule simulation is an effective method to analyze the progress of concrete rolling construction and its simulation accuracy is an important indicator that project managers care about. However, existing roller compacter concrete construction simulation research pays less attention to the impact of construction process changes caused by compaction quality on simulation accuracy. Based on the real-time monitoring system of concrete rolling construction, this paper establishes a simulation model of concrete rolling construction considering compaction quality. The model firstly reconstructs the property parameters of roller compacted concrete using the improved generated adversarial network, secondly, considering the nonlinear correlation characteristics of parameters affecting compaction quality, a concrete compaction quality analysis model based on improving grey wolf optimized convolutional neural networks (IGWO-CNN) was built. Finally, the intelligent analysis model of compaction quality was embedded into the simulation model of concrete rolling construction. Based on real-time monitoring data, the simulation model was driven and the simulation process was adjusted adaptively. Taking the construction of a roller compacted concrete dam in China as an example, the validity and superiority of this model are proved.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: