Answers are grounded in this paper and cite their sources.
This paper explores a periodic review inventory model under stochastic demand. The setup (or ordering) cost and the lead time are controllable. The model considers an imperfect production process, whose quality can be improved by means of an investment. A backorder price discount to motivate customers to wait for backorders is included. The demand in the protection interval is first assumed Gaussian; then, the distribution-free approach is adopted. The objective is to determine the review period, the setup cost, the quality level, the backorder price discount, and the length of lead time that minimize the long-run expected total cost per time unit. A solution method for each case is presented. Numerical experiments show that substantial savings can be achieved if the quality level, the setup cost and the lead time are controlled, and if a backorder price discount is applied. A sensitivity analysis is finally carried out.
No takes yet. Share an insight, caveat, or question.
Castellano et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: