The truck allocation problem is an important section of the transportation system in open-pit mines. Most available models for the truck scheduling problem do not directly address the stochastic nature of truck-shovel systems by using multi-objective optimization techniques. This paper presents a chance-constrained goal programming (CCGP) model based on four important goals to estimate the impacts of the uncertainty on the efficiency of truck-shovel systems. The proposed model has been implemented using 11 schedule scenarios and different confidence levels (CLs) for loader’s production to determine the best allocation of trucks in an open-pit copper mine. The results display that the model can handle the quality and quantity of material required to achieve the objectives of the short-term production schedule of the mine in all CLs, even in the highest risk level. This model has a remarkable ability to meet the required objectives in terms of uncertainty in mining operations.
No takes yet. Share an insight, caveat, or question.
Mohtasham et al. (2021) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: