Answers are grounded in this paper and cite their sources.
Purpose. The aim is classification of risks that are specific to the sorting process, establishment of acceptable levels and installing sorting process parameters that affects on risk level. Methodology. Hump yard is a difficult technological and infrastructure complex, in the operation of which the railway track interacts with automation system, telemechanics and connection, switching locomotives, carriages, cargo and process stuff, which increases the complexity of the problem to ensure safety. The methods theory of traffic safety of the trains and risk management are used in analyzing. Findings. The main objects of risk for humps is regulation of speed of sliding cars which works in danger zone(individual risk), infrastructure of humps, rolling stock and freight which is transported there (technical risk). There is economic risk on the hump yards also, which associated with an increase in the cost of sorting process in its execution. The tolerance probability of adverse events for different types of risk is recommended. Originality. All the risks are systemized and they are typical for break-up of trains on the hump which allow us to improve methods of constructions of permissive regime for slowdown of cuts on yard and optimization the speed their rolling down from the humps. Practical value. The use of the proposed methods allows to improve the security marshalling process at railway stations.
No takes yet. Share an insight, caveat, or question.
С. В. ГРЕВЦОВ (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: