Construction activities require a set of work spaces to be executed safely and productively. The locations and volumes of these spaces change in three dimensions and across time, according to project-specific design and schedule information. Previous research on construction space management requires users to specify the spatio-temporal data necessary to represent each project-specific space needed for construction. Since a construction schedule consists of hundreds of activities requiring multiple types of spaces, this approach is practically infeasible. There is a need for a generic (project-independent) representation of work spaces, from which the project-specific instances of spaces can be derived automatically based on project-specific design and construction schedule information. This paper formalizes such a generic space description as a computer-interpretable ontology. This ontology is general, reusable, and comprehensive. A prototype system developed uses this ontology to capture the spatial requirements associated with construction methods and to automate the generation of project-specific spaces represented in three dimensions and across time.
No takes yet. Share an insight, caveat, or question.
Akinci et al. (2002) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: