Key result
Implementation of protocol changes monitored via statistical process control significantly reduced median door-to-balloon times, with the upper control limit decreasing from 209 to 86 minutes.
Why the study?
Does the implementation of protocol changes monitored by statistical process control reduce door-to-balloon time in STEMI patients undergoing PPCI?
Observational (n=841)
No
Does the implementation of protocol changes monitored by statistical process control reduce door-to-balloon time in STEMI patients undergoing PPCI?
Statistical process control methodology effectively monitors and provides real-time feedback to significantly reduce door-to-balloon times in STEMI patients undergoing PPCI.
Answers are grounded in this paper and cite their sources.
May support SPC-monitored protocols to shorten door-to-balloon times in STEMI; leaves open need for randomized confirmation.
BACKGROUND: Strategies to reduce DTB (door-to-balloon) time have been previously described. However, there is no well-established data-monitoring system that can be used for prompt feedback. The aims of this study were to use statistical process control (SPC) methodology to measure current processes, to provide real-time feedback on the impact of a change in service delivery and to identify individual outliers for specific investigation. METHODS: A prospective study was conducted in a tertiary centre in North England. Data were collected for 841 consecutive STEMI patients from the local district undergoing PPCI. The impact on median DTB time after changes in protocols were prospectively determined. RESULTS: Median DTB times fell significantly as a result of changes in protocol. The upper control limit (UCL) decreased from 209 to 86 min and narrower control limits indicated improved performance. The main outliers included patients presenting to the Accident and Emergency department and patients who developed STEMI while being treated in non-cardiology wards for other reasons (18.3% of the study population). CONCLUSIONS: SPC provides a statistically robust mechanism for assessing the effect of process redesign interventions, and in this context provides a clear visual representation of DTB times for individual patients. Identification of significant outliers allows investigation of any variation with a special cause. It allows a unit to identify when a system of service delivery, albeit stable, is inadequate and needs redesign and can monitor the impact of changes in protocol.
No takes yet. Share an insight, caveat, or question.
Kunadian et al. (2010) conducted an observational in STEMI (n=841). Protocol changes monitored via statistical process control vs. Prior to protocol changes was evaluated on Upper control limit (UCL) for door-to-balloon time. Implementation of protocol changes monitored via statistical process control significantly reduced median door-to-balloon times, with the upper control limit decreasing from 209 to 86 minutes.
Synapse has enriched 10 related papers. Consider them for comparative context: