Life cycle assessment (LCA) was undertaken for a proposed wind farm of ten Gamesa wind turbines with a 2 MW each. A 20 MW land-based wind turbine’s lifetime primary energy consumption was found to be 56 GWh, compared to the 2082 GWh of electric energy it produces. Energy payback takes 6.3 months, has a payback ratio of 38, and an energy intensity of 0.0269 kWhprim/kWhprod. The emission of 8.83 g/kWhprod of CO2 eq. The cost savings associated with CO2 mitigation amount to $155 million in savings. Additionally, the amount of money saved as a result of fuel savings was calculated at $56 485 million, in which could be used to invest in wind farms development. The GHG avoided emission is 7.7 M ton. The energy consumed by manufacturing process accounted for 79.4%, recycling comes in second with 15.6%, then transportation with 4.6%. The CO2 emissions of production phase of the wind turbine accounted for 63.35% of total CO2 emissions, while recycling accounted for 33.15% and transportation for 3.5%, with negligible share of landfilling and operation and maintenance phases.
No takes yet. Share an insight, caveat, or question.
Elmariami et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: