Multiple-case study reveals severe earthwork delays in hillside utility-scale solar farms, highlighting earthwork volume intensity as a key metric for pre-construction schedule risk planning.
Purpose - This study examines how different types of constraints influence delay outcomes in utility-scale solar farm civil construction and proposes a constraint-based taxonomy comprising Physical, Socio-environmental and Technical-operational categories. It also introduces Earthwork Volume Intensity (EVI, m³/MWp) as a terrain-normalised indicator of earthwork demand. Design/methodology/approach - A multiple-case study design is applied to eight solar farm projects in Thailand (169 MWp total) delivered under standardised equipment and contractual conditions. Primary schedule data are analysed through cross-case pattern analysis and exploratory statistical methods, including Pearson correlation, ordinary least squares regression and the MannWhitney U test. Findings - Within hillside terrain, EVI provides a more consistent explanation of delay severity than project scale, indicating a direct link between terrain-driven workload and schedule performance. Hillside projects experienced substantially higher earthwork delays (36- 57%) than flat-terrain projects, while foundation delays were effectively mitigated through a change in construction method (driven concrete to steel screw piles). The apparent correlation between project scale and delay reflects outlier leverage rather than a causal mechanism. Research limitations/implications - The sample size (n = 8) and single-organisation data source limit statistical power and generalisability. EVI is positioned as a planning-oriented diagnostic rather than a statistically validated predictor; validation across larger, multi-organisation datasets is required. Practical implications - The constraint taxonomy and EVI metric provide a structured pre-construction decision framework supporting differentiated contingency allocation by terrain type, agricultural-calendar coordination for socio-environmental risks and geotechnical-informed foundation selection. Owner’s Engineers managing multi-site portfolios can apply the framework using routinely collected schedule data. Originality/value - This is the first study to apply a constraint-based delay taxonomy to solar farm civil construction and to introduce EVI as a terrainderived schedule risk indicator. The single-organisation controlled design isolates terrain effects from confounders typically present in multi-organisation construction delay studies.
No takes yet. Share an insight, caveat, or question.
Chuntarapadit et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: